My brother Bernie came by to assist with the project so we continued from last weekend with the pitot air pressure installation. With the pitot air pressure manifold installed we plumbed the EFIS/EM and AOA CPU and then ran the plumbing through the fuselage to the wing to fuselage exit point. Several clamps, brackets and tube stand offs had to be installed for the pitot air pressure tubing. With the fuselage end of the pitot air pressure plumbing taken care of we turned to the wing. We cut the aluminium tube in the wing and installed an aluminium tube to flexible tube adapter with quick disconnect. Lastly we fitted and installed the AOA system sensing ports in the outboard end of the left wing.
Pitot pressure manifold and plumbing installed
Pitot pressure aluminium tube to flexible tubing adapter installed